We’ve begun our Spring management activities with the aim of getting Clary Lake filled up for another boating, fishing, and swimming season, about week earlier than usual because of all the snow and rain we’ve been blessed with this year. Our spring management includes adding stop logs to the weir to start raising the lake level to it’s spring high while opening the gate to increase outflows to maintain minimum flows, and also to keep the lake from rising too quickly. It’s a balancing act made more difficult with having to second guess the weather. Because of drought conditions the previous 3 years, it has been a challenge raising the lake level in the spring while at the same time maintaining outflows. We pretty much have the opposite problem this year! After the first two months of 2022 we’re 2.5 inches of precipitation above normal for this date. The picture shows Steve Cowles on March 9th cranking open the gate the other day, with Dave Knight standing by with the folding ruler. There are 4 threads to the inch on the screw, so opening the gate 12″ means turning the gate wheel 48 turns. That’s a workout. Today, we installed the last two stop logs in the weir. You can track all the action on the 2022 Dam Operation Log.