
Totally Staged Photo of George Fergusson posing at the gate. Colin Caissie actually did all the heavy cranking.
I had intended to post some news and pictures on the dam repairs before now but I have been out straight and only now, the day before Christmas, have I found the time to sit down and do it. Last Tuesday workers with PCS removed the concrete forms and pulled some sandbags. They came back the next day to clean up and load up the rest of their gear and materials, bringing to completion the initial repairs to the Clary Lake dam. That afternoon, Colin Caissie completed fabrication of a wrench to operate the gate, and we wasted no time in closing it. Part of the rush was the anticipated rain forecast for Friday: we really wanted to capture the runoff! Here are a few pictures from when we closed the gate, and a video of water flowing over the weir: Continue reading










